Building an ADU in Toronto: Your Complete Homeowner’s Guide

  • John Barnhart
  • Sep 25
  • 3 min read
Toronto red brick detached house with text overlay reading ‘Thinking of adding an ADU? Building an ADU in Toronto’ — blog header image for a homeowner’s guide to ADUs
Thinking of adding an ADU in Toronto? Here’s what you need to know before you build.

Toronto homeowners are feeling the pressure of rising housing costs — and many are getting creative with their properties. One of the smartest solutions is the Accessory Dwelling Unit (ADU). Whether it’s a basement apartment, a garden suite, or a laneway house, ADUs add space, generate rental income, and increase property value.


But building an ADU in Toronto isn’t as simple as calling a contractor. Between zoning rules, fire access, grading requirements, and building code hurdles, there are a few things you’ll want to know before you dive in.


Step One: Always Check Your Zoning

Before you spend a dime on drawings, the most important step is to check the zoning for your property. Toronto’s bylaws determine whether your lot can have a secondary unit, where you can build it, and how big it can be.


👉 Skipping this step is one of the top reasons homeowners run into delays. If your property isn’t zoned properly for the ADU you’re imagining, your permit simply won’t move forward.

(Tip: Contact the City of Toronto or check their zoning maps before you start design work.)


Detached ADUs: Fire Access and Lot Grading

Thinking of building a backyard rental suite? Toronto allows garden suites and laneway houses, but only if you meet some very specific rules.


🚒 Firefighting Access

The City requires that emergency crews can safely reach your unit in case of a fire. That means:

  • The front door of the ADU must be within 45 metres of a fire truck parked on the street, and that truck must also be within 45 metres of a hydrant.

  • You need a clear pathway that’s at least 1.0 metre wide and 2.1 metres high from the street to the unit.

  • That path must stay open — a gas meter or hydro line is fine, but fences, air conditioners, or sheds can’t block the way.


If your lot doesn’t allow for this fire route, your garden suite won’t be approved no matter how nice the design is.


🌱 Lot Grading & Drainage Plan

Detached ADUs also require a lot grading plan, prepared by an engineer or surveyor. This shows how rainwater will flow once your new building is in place, making sure you don’t flood your neighbours or your own backyard.


It’s an extra cost to budget for, but it’s non-negotiable in Toronto.


Basement Apartments: Mind the Details

Basement apartments are one of the most popular types of ADUs in Toronto — but they’re also some of the trickiest to get right. The building code sets out very specific requirements that go beyond just finishing the space.


The biggest hurdle for many older homes is ceiling height:

  • At least 6'5" (1.95 m) throughout most of the unit.

  • It can drop to 6'1" (1.85 m) under beams, ducts, and bulkheads — but no lower.


Other critical requirements include:

  • Room sizes: Living spaces and bedrooms must meet minimum floor area standards under the Ontario Building Code. Tiny rooms or awkward layouts may not qualify.

  • Daylighting: Bedrooms and living areas must have windows that provide natural light and ventilation. A space without proper daylighting won’t be approved as a legal unit.

  • Fire separations: Fire-rated walls and ceilings are required to separate the unit from the rest of the home.

  • Safe exits: At least one exit — or an egress window in bedrooms — must be provided so occupants can escape in an emergency.


👉 For many basements, ceiling height and daylighting are the make-or-break factors. Even a finished space with drywall, flooring, and lighting may not qualify as a legal unit without meeting these minimum standards.


Why Work With The Building Permit Guy

Toronto’s ADU rules are detailed, and small oversights — like not confirming zoning, forgetting fire access, or missing a grading plan — can set your project back months.


At The Building Permit Guy, we:

  • Provide BCIN-certified drawings that meet Ontario Building Code requirements.

  • Prepare permit-ready plans for basements, garden suites, and laneway houses.

  • Help homeowners move smoothly through the building permit process by making sure your drawings are complete and code-compliant.


👉 You’ll still need to confirm zoning directly with the City of Toronto before starting — but once that’s done, we’ll handle the technical side to get your plans approved.


Ready to Build Your Toronto ADU?

Whether you’re planning a basement apartment in East York, a garden suite in Scarborough, or a laneway house downtown, the right planning makes all the difference.


👉 Contact The Building Permit Guy today and let’s get your Toronto ADU moving from idea to approved.